Overview

15% less setup time across nine presses. Every minute spent setting up a press is a minute it is not making parts. As the Process Improvement Intern at M.S. Ambrogio North America in Auburn, Maine, I worked to reduce press setup time by standardizing how setups are documented and done.

What I did

  • Redesigned the setup sheet. I created a new standard format for press setup sheets, then updated and data-validated more than 160 sheets in Excel.
  • Trained the operators. I onboarded operators to the new standardized sheets, reducing setup variation across shifts.
  • Laid groundwork for faster changeovers. I developed shadowboard layouts so tools have a set place at each press.
  • Controls. I also wrote basic ladder logic for PLC-controlled equipment.

Results

  • 15% lower average setup time across nine presses
  • 30% lower setup time on a group of three high-speed presses
  • 160+ setup sheets updated and validated